Ball Mill at Newmont Ahafo North
Installed 24’x 39‘- 6” 14,000 kw Ball Mill at Newmont Ahafo North Project July 2024 to May 2025.
Sag Mill at Newmont Ahafo
Installed 8.5 m x 4.85 m 7,000 kw Sag Mill at Newmont Ahafo North Project July 2024 to May 2025.
Sag Mills girth gears at Newmont Ahafo
Successfully swapped a two 34’X 18” Sag Mills girth gears at Newmont Ahafo site in October 2023.
Installed and commissioned two 1500 Vertical Mill VTM
Installed and commissioned two 1500 Vertical Mill VTM (2021 & 2022 at MAPA in Liberia as a business partner to Metso: Outotec in 2022)
Installed and commissioned a 15’5” X 27’ Ball Mill
Installed and commissioned a 15’5” X 27’ Ball Mill (July 2021 to Oct. 2021 at MAPA in Liberia as a business partner to Metso: Outotec)
Changed a girth gear and a complete drive component
Changed a girth gear and a complete drive component on a 20” X 20” Sag Mill at AngloGold Ashanti, Iduapriem Mine (2021)
Managed and supervised the installation and commissioning of a 1500W
Managed and supervised the installation and commissioning of a 1500W Metso: Outotec Vertical Mill June 2021
Managed and supervised the Installation and commissioning of a 1000W
Managed and supervised the Installation and commissioning of a 1000W Metso:Outotec Vertical Mill July 2020
Managed the refurbishment of Sag Mill 2 at AngloGold
Managed the refurbishment of Sag Mill 2 at AngloGold Ashanti in Obuasi Mine site in September 2019.
Supported in the installation and commissioning of a 54 – 75
Supported in the installation and commissioning of a 54 – 75 Metso Gyratory crusher at Newmont Goldcorp Ahafo Expansion project in Ghana in October 2019
Refurbishment of two CITIC Ball Mills 3.2 X 5.M
Refurbishment of two CITIC Ball Mills 3.2 X 5.M at SL Mining, Marampa Site in Sierra Leone in October 2019.
Managed the installation and commissioning of 34’ X 18’
Managed the installation and commissioning of 34’ X 18’ Metso Sag Mill at Newmont Goldcorp mine site Ahafo Expansion Project in Ghana in August 2019.
Performed the cold commissioning of both primary and reclaim METSO apron feeders
Performed the cold commissioning of both primary and reclaim METSO apron feeders at Asanko Mining in Ghana in December 2015.t
Installation of a new 34’DIA X 18’.2 LG Sag Mill at Newmont Gold Ghana Limited
Installation of a new 34’DIA X 18’.2 LG Sag Mill at Newmont Gold Ghana Limited Ahafo Kanyase – Ghana since September 2018 to October 2019.
Refurbishment and commissioning of Sag Mill 2 at AngloGold Ashanti
Refurbishment and commissioning of Sag Mill 2 at AngloGold Ashanti in Obuasi Mine site in May 2019 to October 2019.
Injection of stratathane in a 24’- 0” x 39’ – 6” Ball Mill horizontal flange
Injection of stratathane in a 24’- 0” x 39’ – 6” Ball Mill horizontal flange at Newmont Gold Ghana Limited Ahafo Kanyase site.
Monthly shutdown maintenance, inspection and repairs
Monthly shutdown maintenance, inspection and repairs at Ahafo Newmont Mine site Kanyase.
Inspection of pinion bearings for a ” Sag Mill and Ball Mill
Inspection of pinion bearings for a 34’ – 0” x 18’ – 2” Sag Mill and 24’ – 0” x 39’ – 6” Ball Mill at Newmont Gold Ghana Limited Akyem New Abirem.
Annual inspection and trouble shooting of a 16’ x 24’ Ball Mill
Annual inspection and trouble shooting of a 16’ x 24’ Ball Mill at Burkina Mining Company in Burkina Faso (Youga Site).
Changing of a Bill Mill trommel screen
Changing of a Bill Mill trommel screen at Newmont Akyem plant.
Monthly shutdown maintenance, inspection and repairs
Monthly shutdown maintenance, inspection and repairs at Akyem New Abirem site.
Annual inspection of a Sag and Ball mills
Annual inspection of a Sag and Ball mills at Bogoso Golden Star Mine.
Stripping and inspection of a Sag Mill gearbox
Stripping and inspection of a Sag Mill gearbox for overhauling at Bogoso Mine site.
Inspection and confirmation of a new pinion
Inspection and confirmation of a new pinion at Wassa Golden Star Resources.
Re-aligning and installation of the Ball Mill gearbox and drive train
Re-aligning and installation of the Ball Mill gearbox and drive train at Bogoso Golden Star Resources.
Proposal of a new vibratory grizzly feeder
Proposal of a new vibratory grizzly feeder to be installed into the primary crushing circuit at the Asanko Gold Mine Site.
Consulting on Maintenance Strategy for Newmont Gold Ghana
Consulting on Maintenance Strategy for Newmont Gold Ghana Akyem Site.
Pinion shaft change out on a 34’ X 18’ Sag Mill
Pinion shaft change out on a 34’ X 18’ Sag Mill at Newmont Ahafo Site.
Changing and alignment of a new pinion shaft
Changing and alignment of a new pinion shaft at Golden Star Resources Limited Wassa Akyempim. January 2017
Changing of fixed jaw plate and toggle seats and plates
Changing of fixed jaw plate and toggle seats and plates at Asanko Mine in February 2017
Installation of new flow dividers
Installation of new flow dividers for Newmont Golden Ridge Limited for the Sag and Ball mills at the new Abirem Site in March 2017.
Changing of feed end spherical roller Trunnion bearing of a Sag Mill
Changing of feed end spherical roller Trunnion bearing of a Sag Mill at Golden Star Resources Limited Bogoso in March 2017

PROJECTS AT METSO


SYAMA GOLD MINE MALI 2014
Installation and commissioning of a 20′ X 20′ EGL SAG MILL

OCP PHOSPHATE PLANT SAAFI IN MOROCCO
Annual inspection of 3 Ball Mills at OCP phosphate plant in Morocco in year 2015.

SUKHAYBARAT SITE- SAUDI ARABIA
Ball and Rod Mills evaluation in Maadem Gold mine (SUKHAYBARAT SITE) –  Saudi Arabia

NEWMONT GOLD LIMITED IN GHANA 2012 - 2013
Supervised the Installation and Commissioning of a 34’ X 18’- 2 Metso Sag Mill and 24’ X 39’ – 6” Metso Ball Mill

GUINEA – LERO 2012
Replacement of AEROFALL SAG MILL Trunnion and pad bearings in Guinea

EVALUATION IN DRC Congo
Evaluation and re-aligning of two BABCOCK MILLS in (DRC Congo) formerly owned by ANVIL MINING CONGO DIKULUSHI) But at the time owned by MAWSON WEST 2011.

ANGLO ASHANTI IDUAPRIEM MINE
Supervised the installation and commissioning of a 14”-0’ X 24”-0’ Ball Mill at Anglo Ashanti Iduapriem Mine in Ghana.

YOUGA PROJECT IN BURKINA FASO
Supervised the Installation and Commissioning of a 16’ – 6” X 24’ Ball Mill at B.M.C Burkina Mine.

UPPER QUARRY BOLGATANGA
Installation and commissioning of mobile crusher

AHAFO PROJECT By NEWMONT GOLD LIMITED
Supervised in the Installation of a 34’ X 18’- 2 Sag Mill and 24’ X 39’ – 6” Ball Mill. Assisted in the Installation and commissioning of a 54 – 75 Gyratory and MP 800 Pebble Crushers.

SVEDELA
Installation and maintenance of 1000 Series Crushers

.

Spoiler title
Hidden content
Spoiler title
Hidden content
Spoiler title
Hidden content
Spoiler title
Hidden content
Spoiler title
Hidden content
Spoiler title
Hidden content
Spoiler title
Hidden content
Spoiler title
Hidden content
Spoiler title
Hidden content

PROJECTS EXECUTED BY MONTY PRESTIGE ENGINEERING AND CONSULTANCY LIMITED

NEWMONT GOLD GHANA LIMITED (NGGL) AHAFO MINE SITE.
Injection of stratathane into the horizontal flange of the Ahafo Ball Mill and the change out of Sag Mill right hand side (RHS) pinion shaft.

NEWMONT GOLDEN RIDGE LIMITED (NGRL) AKYEM MINE SITE.
Inspection of mills during shutdown and changing of the left hand side (LHS) pinionoshaft of both Sag and Ball Mills.

ARIAB MINING COMPANY (AMC) SUDAN
Changing of Pinion Shaft, Annual Inspection, and Training of maintenance personnel.

GOLDEN STAR RESOURCES LIMITED (GSRL) BOGOSO/PRESTEA MINE
Changing of Ball Mill Trunnion bearing, Installation of a refurbished gearbox of the Ball Mill and the checking of drive train alignment on both mills.

BURKINA MINING COMPANY IN BURKINA FASO (YOUGA SITE).
Annual inspection and trouble shooting of a 16’ x 24’ BALL MILL at Burkina Mining Company in Burkina Faso.